
The 100th transfer station of the Beijing Subway.
Starting from the first train on the morning of November 8th, Beijing Subway Line 8 Dahongmen Station opens. After opening, Line 8 Dahongmen Station and Line 10 Dahongmen Station will enable in-station transfers. With the opening of Line 8 Dahongmen Station, it also becomes the 100th transfer station of the Beijing Subway.

The total length is about 30.8 kilometers, with 32 stations.

The total length is 81 kilometers, with a design speed of 250 kilometers per hour.

The total length is about 57.99 kilometers, with 21 stations.