The total length is about 62.4 kilometers, with 15 stations.
The econd phase of Line 13 is 8.3 kilometers long, with a total of 4 stations; the second phase of Line 14 is 9 kilometers long, with a total of 7 stations.
The second phase of Line 16 is 9.54 kilometers long, with a total of 8 stations; the second phase of Branch Line 6 is 4.95 kilometers long, with a total of 3 stations.
The total length is about 10.6 kilometers, with 6 stations.
The total length is about 21.8 kilometers, with 15 stations.
The total length is about 22.9 kilometers, with 16 stations.
Extension Section starts at LENGTANGCUN Station and ends at LONGGANG Station, including WUXIANG Railway Station, QINGPINGPO Station, and LONGGANG Station across three stations and three sections.
The second phase of Line 17 is 24.76 kilometers long, with a total of 18 stations; the third phase of Line 10 is 5.87 kilometers long.
The total length is 39.4 kilometers, with 25 stations.
The line is 37.4 kilometers long with 30 stations.