The section from Xiaojie Station to Xizhan Station, which is about 20 kilometers long, has been opened.
To facilitate track maintenance, the Maglev line's operation mode has been adjusted from dual-track to single-track operation.
The East Extension of Line 1 spans a total length of 16 kilometres and features 10 stations.
The operational mileage of the Guangzhou Metro network has reached 751.1 kilometers.
The three extension sections have a total length of 31.7 kilometers and include 19 stations.