The East Extension of Line 1 spans a total length of 16 kilometres and features 10 stations.
At 9:20 30th June,2025. The Shenyang Metro Line 1 East Extension commenced its initial operations. The East Extension of Line 1 spans 16 kilometres and includes 10 stations. From west to east, the stations are: Xinhui Street Station, Xinning Street Station, Dongdaying Street Station, Agricultural University Station, Qianling Station, Dongling Park Station, Shuquan Station, Boguannorth Street Station, Botanical Garden Station, and Shuangma Station. Once opened, the line will operate in conjunction with the existing Metro Line 1, adopting a "large and small loop" operation model. The large loop runs from Shisanhao Street Station to Shuangma Station, while the small loop runs from Shisanhao Street Station to Dongdaying Street Station. Trains on both loops will alternate in a 1:1 ratio.
The section from Xiaojie Station to Xizhan Station, which is about 20 kilometers long, has been opened.
To facilitate track maintenance, the Maglev line's operation mode has been adjusted from dual-track to single-track operation.
The operational mileage of the Guangzhou Metro network has reached 751.1 kilometers.